Plans, permits and design for commercial and residential property in Manhattan Beach.

Lumignus prepares architectural plans and engineering plans and manages permits for commercial and residential projects in Manhattan Beach. We handle design, grading and drainage plans, feasibility and property development support for retail, restaurants, offices, condominium buildings and custom homes.
Manhattan Beach has some of the most valuable small lots in California, a walkable downtown and a commercial corridor along Sepulveda Boulevard. Tight sites, height limits and coastal rules mean every square foot of a design has to be planned.
One department. The city's Community Development Department reviews zoning and building plans and issues permits. Planning review comes before building plan check.
Districts and the coastal zone. The city is divided into area districts with different height, floor area and setback rules. West of Sepulveda, much of the city is in the coastal zone, where many projects need a coastal permit from the city.
Basements and shoring. Deep excavation next to neighbors on sandy soil needs soils reports, shoring design and drainage plans, all part of the engineering plans.
Commercial work includes restaurant, retail, medical and office tenant improvements downtown, in the North End and along Sepulveda. Residential work includes custom homes, major remodels, additions and ADUs.
The City of Manhattan Beach. Its Community Development Department handles zoning, coastal permits and building plan check, and issues the permits.
Yes. Commercial work is our main focus: tenant improvements, retail plazas, restaurants, offices and multifamily buildings. We prepare the architectural plans and engineering plans and manage the permits through issuance.
It depends on the project. California requires licensed professionals to prepare and stamp plans for most commercial buildings and for many structural and grading scopes. Lumignus works with licensed architects and engineers as each project requires.
The city limits height and floor area by district, and limits are strict near the beach. Many owners add space with a basement, which needs shoring and structural engineering plans. A feasibility analysis shows the buildable size for your lot.
With a feasibility analysis. It takes 3-5 days and tells you what can be built on the property, which plans and permits are needed and what the main risks are.