Plans, permits and design for commercial and residential property in Brentwood.

Lumignus prepares architectural plans and engineering plans and manages permits for commercial and residential projects in Brentwood. From our Beverly Hills office we handle design, hillside grading and drainage plans, feasibility and property development support for retail and office spaces, multifamily buildings and custom homes.
Brentwood combines a busy commercial strip along San Vicente Boulevard with flat residential streets and steep canyon lots to the north. The rules for a storefront, an apartment building and a hillside home here are very different, so we start by confirming what applies to the address.
City of Los Angeles permits. Brentwood is a Los Angeles neighborhood. Los Angeles City Planning handles zoning and LADBS reviews the plans and issues building and grading permits.
San Vicente commercial corridor. Storefronts, signs and new buildings along San Vicente Boulevard fall under a scenic corridor specific plan with its own design review, in addition to plan check.
Hillside and fire zone lots. North of Sunset Boulevard, many lots are covered by the city's hillside rules and lie in a very high fire hazard zone. Grading limits, soils reports and fire-resistant construction shape the engineering plans from the start.
Commercial work includes retail, restaurant and office tenant improvements and multifamily buildings. Residential work includes custom homes, hillside homes, additions, ADUs and major renovations.
Brentwood is part of the City of Los Angeles. The Los Angeles Department of Building and Safety (LADBS) issues building and grading permits, and Los Angeles City Planning handles zoning and design review.
Yes. Commercial work is our main focus: tenant improvements, retail plazas, restaurants, offices and multifamily buildings. We prepare the architectural plans and engineering plans and manage the permits through issuance.
It depends on the project. California requires licensed professionals to prepare and stamp plans for most commercial buildings and for many structural and grading scopes. Lumignus works with licensed architects and engineers as each project requires.
Los Angeles hillside rules limit building size, height and the amount of grading based on the slope of the lot. Most hillside projects need a soils and geology report, grading plans and fire-zone construction details. We check these limits before design starts.
With a feasibility analysis. It takes 3-5 days and tells you what can be built on the property, which plans and permits are needed and what the main risks are.