Plans, permits and design for commercial and residential property in Lomita.

Lumignus prepares architectural plans and engineering plans and manages permits for commercial and residential projects in Lomita. We handle design, grading and drainage plans, feasibility and property development support for storefronts, small commercial buildings, multifamily buildings, ADUs and homes.
Lomita is a small city of about two square miles between Torrance and the Palos Verdes Peninsula. Its commercial property lines Pacific Coast Highway, Lomita Boulevard and Narbonne Avenue, and its neighborhoods mix single-family homes with small multi-unit lots.
A small city hall. City staff review zoning, use and site design first. Building plans are then checked for code compliance before permits are issued.
Commercial corridors. New tenants in existing storefronts often trigger parking, sign and accessibility requirements. A change from retail to restaurant or medical use needs a closer look.
Sloping lots. The southern edge of the city rises toward the Peninsula, where grading plans, retaining walls and drainage design become part of the project.
Commercial work includes storefront, restaurant, medical and office tenant improvements and small commercial and mixed-use buildings. Residential work includes multi-unit projects, ADUs, additions and new homes.
The City of Lomita. City staff handle zoning approvals, and building plans are checked and permits issued through the city's building and safety service. We confirm the current submittal steps at the start of each project.
Yes. Commercial work is our main focus: tenant improvements, retail plazas, restaurants, offices and multifamily buildings. We prepare the architectural plans and engineering plans and manage the permits through issuance.
It depends on the project. California requires licensed professionals to prepare and stamp plans for most commercial buildings and for many structural and grading scopes. Lumignus works with licensed architects and engineers as each project requires.
Yes. On small lots, one rule about parking, setbacks or lot coverage can decide whether a second unit, a new storefront use or an addition is allowed. Checking first costs far less than redrawing plans later.
With a feasibility analysis. It takes 3-5 days and tells you what can be built on the property, which plans and permits are needed and what the main risks are.