Plans, engineering and permits for laboratories, clean rooms and controlled environments in Greater Los Angeles.

Lumignus prepares the architectural plans and engineering plans and manages the permits for laboratories and clean rooms. We check the building, the zoning and the utilities before you commit, then produce documents that the city and contractors can work from.
Laboratories and clean rooms are driven by their systems. Air, pressure, exhaust, power and chemical storage decide the layout, the occupancy classification and often whether a building can be used at all. We check those first, then prepare the plans and permits.
Lumignus prepares plans and manages permitting, working with licensed architects and engineers as each project requires. Clean room performance is tested and certified by an independent testing company. Construction is carried out by the licensed contractor you select.
Discuss a laboratory or clean room project
Often yes. The limits are usually ceiling height, roof capacity for equipment, electrical service, and how much hazardous material the building's construction allows. We check these before you sign a lease or buy.
Clean rooms are rated by how many particles are allowed in the air, most often under the ISO 14644 standard. Most work falls between ISO 5 and ISO 8. The class sets the filtration, air volume, gowning and finishes, and so the cost. We design to the class your process needs.
It depends on the project. California requires licensed professionals to prepare and stamp plans for most commercial buildings and for many structural and grading scopes. Lumignus works with licensed architects and engineers as each project requires.
Yes. The building code limits how much hazardous material each area can hold. Above those limits the space becomes a high-hazard occupancy with stricter construction, and many buildings cannot take it. We review your chemical list early to keep the project within what the building allows.
With a feasibility analysis. It takes 3-5 days and tells you what can be built on the property, which plans and permits are needed and what the main risks are.